The rate is the news in the sum. At 1 to 1.5% a year the money is cheaper than the state’s tenge borrowing by an order of magnitude, which is what “long money on concessional terms” means in a minister’s mouth; the price of it is that the projects are the bank’s to appraise. The $6 billion is a ceiling for 5 years, drawn project by project.
Kazakhstan is a founding member of the bank, and its portfolio there to date is 7 projects worth $1.8 billion since the bank opened in 2016, Kazinform’s account of the sitting says; the framework triples that in 5 years if the pipeline fills. The 4 named routes are freight routes: 3 roads, in the centre, the west and the oil region, and a railway section, Moyynty to Kyzylzhar, in the centre.
The rate is the news in the sum.
Its president had signed during her February visit; the parliament that ratified is the one seated under the new constitution. A third bank at the table this week, after the ADB and the EBRD with their forecasts of the last 2 days, is the one with the Chinese address.
