Central Asia traded 12.1 billion kilowatt-hours of electricity within its interconnected system in 2024, the bank says. Its new study, Energy Without Borders, argues that countries can obtain more useful power from their existing assets through coordinated dispatch and better use of transmission capacity. That requires agreement on who supplies flexibility and who bears its cost.
The bank names Toktogul and the Naryn cascade in Kyrgyzstan, Nurek in Tajikistan and the prospective Rogun plant as sources of peak supply and seasonal balancing. Thermal generation in Kazakhstan, Uzbekistan and Turkmenistan and growing solar and wind output give the systems different production patterns. A reservoir can help bridge the hours when another country's available generation falls short.
Water carries obligations beyond electricity. Releasing it now can limit the volume available later, while irrigation requirements and domestic power demand constrain a reservoir's operation. The bank proposes treating hydropower flexibility as a measurable service covered by a contract, bringing the cost of providing it into negotiations between countries and specifying the operating conditions under which it can be delivered.
For the upstream states, the bargaining unit would extend beyond the electricity sold. Holding water or adjusting generation for a neighbour's benefit can carry an opportunity cost at home. An agreement that identifies the service and its compensation would make that cost part of the transaction, giving Kyrgyzstan and Tajikistan a basis for negotiating how the regional benefit is shared.
Uzbekistan's planned renewable expansion makes the issue immediate. The bank's public report summary forecasts that constraints could force the country to curtail 2.1 billion kilowatt-hours of renewable generation in 2026 and 3.5 billion in 2028. Those are modelled quantities of potential output that cannot be used, with the result depending on how generation, networks and balancing resources develop together.
Selling some of that output to a neighbour or obtaining balancing support could improve the economics of the new plants. Negotiations over access to another system's flexibility would have to account for the different costs of the solar plant's owner, the grid operator moving its output and the hydropower operator changing its releases.
The bank proposes starting with commercial metering, telemetry and secure data exchange, together with rules for settling deviations between scheduled cross-border deliveries and the flows operators actually measure. A pilot market for electricity delivered the next day would follow, with balancing and system services developed in stages. Each step depends on operators being able to measure what was promised and what crossed the border.
The bank points to Kazakhstan's use of wide-area control systems as an example of improved network management, citing about 250 megawatts of additional permissible transfer capacity. Such gains concern the power the network can carry under the prevailing conditions. They still depend on electricity being available at one end and a buyer able to take it at the other.
National plans cited by the bank envisage at least 62.8 gigawatts of new generating capacity by 2035. The value of each addition will depend partly on access to fuel or water, the ability to transmit its output and the availability of reserves when demand peaks. A regional market could spread some of those requirements across countries, subject to the transmission limits and operating conditions.
Payment for flexibility would make the distribution of the gains explicit. A country asked to change reservoir operations would need compensation and conditions compatible with its own water commitments. A buyer would need a service it can rely on when called, and the contract between them would decide how much of Central Asia's physical interconnection becomes dependable commercial capacity.